Locker Wh, Naples, FL
The Locker Wh project involved a facade remodel for a main commercial building, requiring scaffolding solutions that offered stability and ease of movement for construction crews. RPC Group LLC delivered an efficient setup that adhered to local building codes and safety requirements.
Scaffolding for the Locker Wh Facade Remodel
- Adaptable Design: Structures fitted around the building’s exterior for uninterrupted facade work
- Enhanced Safety: Guardrails, non-slip platforms, and clear access points minimized risks during the renovation
- Streamlined Workflow: The scaffolding system allowed teams to move materials and equipment quickly, accelerating the project schedule