Brick City Lofts, Ocala, FL
At Brick City Lofts, RPC Group LLC executed a two-phase scaffolding project to provide safe and efficient access at multiple elevations. By combining a ring lock system and a parallel support tower, the installation ensured stability and structural reliability throughout construction.
Location: 414 (Building A) and 419 (Building B), SE 1st Ave. Blvd 24-0903, Ocala, Florida 34471
Phase 1
- Installation of two access points at 17 and 29 feet, enabling work on intermediate levels of the building
- Use of a ring lock system known for high load capacity and quick assembly
Phase 2
- Addition of a third access point at 36 feet, allowing construction to advance in upper areas
- A parallel support tower was incorporated for enhanced stability and structural support
Each phase adhered to the highest safety standards, ensuring practical and secure access to all key areas during every stage of the project.